Ipinapakita ang mga post na may etiketa na change. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na change. Ipakita ang lahat ng mga post

Biyernes, Hunyo 26, 2015

Sea change


I found an oopsie while laying track around the Pennsy Marine facility this evening. Turns out there was no drop in bench work to allow for any marine things to reach the repair facility.
Before: There is no water at the marine facility.
Before: Fortunately this is a layout full of modules.
After: The sea change resulted in a standard 1-1/2" drop. I don't know how I determined that was where the tide was back in the summer of '13 when I started installing modules, but that's what it is.
After: A nice little chunk of harbor now allows vessels to reach the Pennsy Marine facility.
And the "main line" is now in from soup (Weehawken) to nuts (Port Authority Pier), and I am closing in on the golden spike. Sounds like a ceremony is in order soon. Where should it take place?

Lunes, Mayo 18, 2015

HBS Yard Change


Plan showing areas of reconsideration

Proposed changes in track arrangement

Sometimes you have to kill ideas that you hold near and dear. When I started this project, the Erie Railroad held a large portion of the focus with Croxton Yard's being the generator of all the traffic on the layout. The latest plan called for only the Weehawken Yard to provide traffic to the HBS, and in a previous version, I was thinking about replacing Croxton with Jersey City (maybe an expansion over the desk area later?). I've been researching the Erie for several years now, and it still garners a lot of my research efforts, but it may be time for it to go from the main part of my layout. (I still will have Erie and other pocket yards.)

Operating areas
While looking at the space dedicated to each operating job, I noticed that there was going to be an overlap in space if two people were to try to operate the HBS yard. While the Erie Weehawken Yard would have enough space, I am eliminating it in this iteration to concentrate the layout on the HBS. This will allow me to keep the closet, which I can't decide is appealing because I am lazy or because it seems like a good idea to have a closet. Losing the Erie operation is a difficult decision, but the difficulty actually indicates it is the right choice. I will still have an Erie switcher at the interchange.

At this point, I can have 5 operating spots on the layout that are pretty well out of the way of the others. There are two in the yard and three out on the main line. These jobs can be handled by 4-6 operators (two yard and two main line trains of 1 or 2 man crews). I also plan to have one pocket yard just outside the main room with 1-2 operators there. Max 8 spots, but optimal number is 5 operators. From recent experience, finding 5-6 operators is really the most that can be comfortably found on any given night in Austin.

The job duties:

Yard Master - In charge of the railroad. Dispatches industry jobs and assigns duties to Yard Switcher. Handles interchange with Erie, makes up inbound and outbound traffic on east side of the yard.

Yard Switcher - Helps Yard Master as needed, switches 14th Street industries and piers.

Industry Switchers - Load and unload Lackawanna car float as well as serve Bethlehem Steel, Maxwell House and the Docks as needed. I am thinking there will probably be two trips to each area during each session by different people.

Pocket terminal - Operates car float to and from yard. Possibly two trips per session. Pocket terminal will rotate from session to session.

So, with Erie dreams scaled back (at best postponed), I've got some odds and ends to do on the bench work before I can start laying track on the HBS "soon."

Martes, Pebrero 17, 2015

Since I am done with track work lets change it and other items!


Yes, the title says it all.  I was totally done with ALL my track work.  Done on both the upper and lower levels, feeder wires, the whole thing.  But, I was not too happy with the sand loading facility trackage and the double diamond, so I ripped it all out.

So I got some changes:

  • No more diamonds or city junction
  • The VA Midland receives another industry: the elevator at Mid-Atlantic Feeds.  
  • The sand facility will have more trackage with 2 spurs
  • With the elimination of the diamond, there will only be 2 signals in this area.

I really wanted to keep the diamond, but it only makes sense and what I had was very unprototypical.
Here's what I am doing.  This all makes more sense and will be a better operation.  It s a quick fix and the only hard part is redoing the feeder wires.   Moving the sand unloader will be no fun either.
No, it's not a wiring nightmare, I'm installing some LED lighting on the upper level. 

Got these light poles about a year ago.  I installed them around the layout, but never hooked them up.  Here's an example of one.  Got them off Ebay from China cheap.  

They definitely put out the light!  Almost too much.

Overall view of the area.  There are a total of 7 lights.

A little night photography?  All I am missing is the flashing red lights from the RR crossing apparatus.