I found an oopsie while laying track around the Pennsy Marine facility this evening. Turns out there was no drop in bench work to allow for any marine things to reach the repair facility.
![]() |
| Before: There is no water at the marine facility. |
![]() |
| Before: Fortunately this is a layout full of modules. |
![]() |
| After: The sea change resulted in a standard 1-1/2" drop. I don't know how I determined that was where the tide was back in the summer of '13 when I started installing modules, but that's what it is. |
![]() |
| After: A nice little chunk of harbor now allows vessels to reach the Pennsy Marine facility. |



