Posted by Unknown on 4:00 PM in 
Am, 
And, 
change, 
done, 
I, 
It, 
items!, 
lets, 
other, 
Since, 
Track, 
with, 
Work | 
No comments
 
  
  
Yes, the title says it all.  I was totally done with ALL my track work.  Done on both the upper and lower levels, feeder wires, the whole thing.  But, I was not too happy with the sand loading facility trackage and the double diamond, so I ripped it all out. 
So I got some changes:
- No more diamonds or city junction
 - The VA Midland receives another industry: the elevator at Mid-Atlantic Feeds.  
 - The sand facility will have more trackage with 2 spurs
 - With the elimination of the diamond, there will only be 2 signals in this area.
 
I really wanted to keep the diamond, but it only makes sense and what I had was very unprototypical. 
  | 
| Here's what I am doing.  This all makes more sense and will be a better operation.  It s a quick fix and the only hard part is redoing the feeder wires.   Moving the sand unloader will be no fun either. | 
  | 
| No, it's not a wiring nightmare, I'm installing some LED lighting on the upper level.  | 
  | 
| Got these light poles about a year ago.  I installed them around the layout, but never hooked them up.  Here's an example of one.  Got them off Ebay from China cheap.   | 
  | 
| They definitely put out the light!  Almost too much. | 
  | 
| Overall view of the area.  There are a total of 7 lights. | 
  | 
| A little night photography?  All I am missing is the flashing red lights from the RR crossing apparatus.   | 
  
  
 
0 (mga) komento:
Mag-post ng isang Komento