Plan showing areas of reconsideration |
Proposed changes in track arrangement |
Operating areas |
At this point, I can have 5 operating spots on the layout that are pretty well out of the way of the others. There are two in the yard and three out on the main line. These jobs can be handled by 4-6 operators (two yard and two main line trains of 1 or 2 man crews). I also plan to have one pocket yard just outside the main room with 1-2 operators there. Max 8 spots, but optimal number is 5 operators. From recent experience, finding 5-6 operators is really the most that can be comfortably found on any given night in Austin.
The job duties:
Yard Master - In charge of the railroad. Dispatches industry jobs and assigns duties to Yard Switcher. Handles interchange with Erie, makes up inbound and outbound traffic on east side of the yard.
Yard Switcher - Helps Yard Master as needed, switches 14th Street industries and piers.
Industry Switchers - Load and unload Lackawanna car float as well as serve Bethlehem Steel, Maxwell House and the Docks as needed. I am thinking there will probably be two trips to each area during each session by different people.
Pocket terminal - Operates car float to and from yard. Possibly two trips per session. Pocket terminal will rotate from session to session.
So, with Erie dreams scaled back (at best postponed), I've got some odds and ends to do on the bench work before I can start laying track on the HBS "soon."
0 (mga) komento:
Mag-post ng isang Komento