Ipinapakita ang mga post na may etiketa na Progress. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na Progress. Ipakita ang lahat ng mga post

Biyernes, Enero 27, 2017

Rivet progress



I finished the rivets on one side of the HBS Boxcab No.500 project this evening. Go ahead... count'm. I have no idea if they are going to print well or not.

Huwebes, Enero 5, 2017

Desk Cleaning Project Progress






In order to clean off my work bench, I had to finish a couple of projects. Usually one will say that other way 'round, but this week my goal is actually to clean my work area and the progress on any models is only beneficial collateral at this point.

The projects in question are two Erie paint and decal jobs. The first is an Erie scale test car kit from Walthers that is no longer available. I found this one on eBay for pretty cheap after letting several go to much higher bids than I finally got this one for. I then ordered the decals from Prime Mover Decals, and Paul sent out this plus another set of HBS 44 tonner decals for no. 700 that is already painted. The kit went together easily, and the decals went on really well. I used number 03440 which matched the style of the Walthers kit dead on (the only thing missing is a small sign board on the railing on the brake end of the car which I can easily add). I happen to have photos of two of the Erie fleet. You will notice that 03441 is of different design, and weighs only 62,000 lbs versus the 80,000 of 03440. '41 seems older, and the notes that Paul provides indicate that '03440 and '03443 were built in 1934 and were the newest for the railroad. He also notes that the wheel bearing style is different - but I can't make out what it is at this point. This can wait until it is shopped again, and I will add the signboard to the railing, too. Kadee no.5s seem to work well - I just need to weather them and paint the red around the couplers.

The Prototype

Older version? test car.
The other project is the painting and decaling of the JJLModels HH660 which is a Proto 2000 S2 epoxy resin modification kit. The only hiccup was my hood was a little bent on the end, but I've managed to almost completely straighten it out just using some heat from a soldering iron. The decals are old Champ brand, and I tore the first regular Roman "ERIE" I tried to apply - it just disintegrated - so I had to go to the alternate extended typeface which seems to match the photo I have of no. 302 at the floats at Jersey City. That was lucky.



It is a tight fit for the QSI sound decoder - 10 lbs of you know what in a 5 gallon locomotive. It is still glossy from the decal process, but the Dullcoat is on the way. The sound is great, and it is a good performer, and it is officially in the rotation for Harlem Station. Other locomotives currently in the rotation are nos.514, 529 and 417. Not all are weathered, but they are all sound equipped, which is my baseline criteria. Weathering will happen in a group sometime in the future.

None of these locomotives actually served at Harlem Station. I'm working on the ones that actually did: no.20 , a boxcab that I need to re-motor and/or just install a decoder, no.26, the now infamous Bachmann 44tonner that I can't get to play nice with either a LokSound micro or Micro Tsunami, and no.320, a Proto 2K S1 that needs to be renumbered and decoder-ized.

And situation normal, I haven't cleaned off my work bench, yet, which was my goal this week. Funny how other stuff always gets done before what is on my list. I find it hard to complain today, though, because I'm going to go fire up the HH660 and bang some cars around the harbor front at 149th St.


Lunes, Nobyembre 7, 2016

Video update of progress


Uploaded a You Tube video on my progress so far on the layout. This covers the expansion on the upper level and the entire lower level.  I'm reworking the track on the Mine Run Branch in the sand loading spur.  It will give me more space for dropping and picking up cars.   As always, if you have any questions, don't hesitate to email me or comment below.


Sabado, Marso 5, 2016

Progress has been slow as of late


Well it seems that ever since my leak last week (couple of posts ago), progress has been very slow.  Had a few other things come up also.  My wife just got her tonsils removed on Thursday so I've been tending to her and the kids alot.  She is in a lot of pain and I've heard that it really bad when they are removed when you are an adult.  She's a tough cookie but this is kicking her butt.  I also did a small train show yesterday to sell a few excess items of mine.  I've always enjoy the smaller shows and if you have some stuff to get rid of, these are the places.  You also will find some deals for you also.
This upcoming week, I hope to get my butt into gear and finish up some projects.  Plan on completing the scenery that I did my improvements to the helix today.  This summer has only seen a few improvements to the layout.  Took care of my motive power shortage also.  I'm also going to retire the red B39-8 I have.  Let me know if you want to buy it.  It's got the whole 9 yards.  My objective this week is to get the Valley Sweetners building built or at least the frame of what I want.  Stay tuned!

Sabado, Setyembre 12, 2015

Progress from this past weekend


Got a bit done on the layout this weekend, but not as much as I hoped.  My layout room is still a disaster from all the work I've done.  I hoped to "straighten" it, but it never happen.  The new area I put in over the summer is a shell of it's former self now.  I've got the scenery just about done.  Should hope to complete this weekend.  The main thing that is incomplete is the assembly of the sand unloader.  The silos are done but the small elevator is not.
Here is the overpass section near the light switch.  Alot easier to scenic when the section is removable.

Little retaining wall I put in the scene.

Super tree painting and drying rack.  These are outside getting their gray paint.  

Here's my rack inside and the tree making has begun!

Here my overpass foam before scenery.  Notice the light switch,


Scenery has gotten a little more vegetation and some rocks (made from plaster) from my old bridge scene.  Just needs some trees.

Another view

The scene in the upper right is complete with a trees and weeds on the small ridge.

The area is starting to come together.

Another view.  Need a few smaller trees on the ridge.

Another view of the ridge.


Sabado, Agosto 29, 2015

Progress on the layout corn syrup facility and woodchip facility buildings


Some progress this week on the layout!  I'm going to focus on mainly the layout the next couple of weeks to try and finish at least the corn syrup facility.  The last two days has consisted of mocking up the corn syrup facilty I had formerly named Valley Sweeteners.  After consulting with my good friend Greg McComas (His Michigan Interstate Railroad) he suggested I change the name to Chesapeake Valley Confectioners (CVC).  This would allow more than just tank cars.  Pneumatic hoppers could also be unloaded.  The facility features one track that goes into an unloading building.  This building could unload various cars such as hoppers and tank cars.  The building can hold two cars.  I was considering adding another track but Battlefield Yard is under capacity now and adding more cars would not help.
My first version of the building.  A combination of Walthers Washington Salvage Yard and Pikestuff walls.  The office building will be cut down to be back from the tracks. 

One of the pressureaid hoppers that can carry loads for the facility.  Already had it weathered and ready to go!

Version #2: Added in another wall with a truck door.  This will be my final mockup.  

Over on the Mine Run Spur, Mine Run Limber is getting some work.  I have the woodchip loader ready to go but wanted a bulding to have the chips coming from.  Thinking about having a inside loading spot?

The spot could have a removable cartridge for one boxcar.  Or I could just put the door on the building and leave it.  What do you guys think?  I find it odd( but not too far fetched) to have the spur go under the chip loader to the building.  Locomotives would never go under it.  The facility would always have enough cars to reach the building.  

Overall view of the facility.  The Apache chip hopper will be patched.  I have 3 of these.  

A little garage I have been working on.  It's from BEST.  Just need the doors and window attached and some weathering.  Even got some shingles for it.   


Sabado, Mayo 30, 2015

HBS Benchwork progress


Adding a 4" extension (clamped portion) to make the backdrop modules into benchwork modules.

Without really trying, I accomplished a goal before the end of the year (it wasn't a real deadline or goal, but I'll take the accomplishment as if it were one of those "I'm going to do this before the end of the year" kind of things). I started converting the modules I acquired earlier this year into benchwork for the Hoboken Shore portion of the layout in the main layout room. 

4" extensions clamped (and glued, Tom!) up ready to attach to backdrop modules.



To begin with, I added a 4" extension to make the modules a full 4' long which resulted in a 20"x48" module. I ripped a 4" strip from several 2'x4'x18mm Luan plywood pieces from the local big box home improvement store. The 4" strips were then turned into the 4" extensions in short order and added to the existing backdrop modules.
Existing backdrop on bottom with extension piece to far left and an existing 1'x4' module on top to create a combined 32"x48" benchwork module.
These modified modules were then added to existing 12"x48" modules to create a new 32"x48" module. New legs to put the top of benchwork (TOB) at 50-3/4" above finished floor (AFF). This height was arrived at from my reach experiments on the 149th as these pocket yards are a little deeper than regular 2x4 benchwork dominos. I see it as a compromise from my preferred height that is up around 54" and a lower height that may be more comfortable for shorter operators.

Legs and feet (knees and toes). Adjustable feet in 2x3s.
Something of interest I'm doing is using 2x3s for legs instead of standard 2x2s. At my local big box home improvement store, they only had pine 2x2s and no oak 2x2s which David Barrow uses on the CM&SF. The oak is strong and straight, the pine are a cheaper, inferior, but perfectly useable alternative - except when the only thing left are the dregs that are warped, split and worthless. So in steps the 2x3s that are only about 50 cents more than the 2x2s and a lot cheaper than oak. They are labeled Spruce-Pine and smell pretty good, plus they were really straight and tight-grained and strong. The extra heft is pretty nice (at a very small premium), so I'm going to look to continue using them at this point.


So I managed to convert and install 4-1/2 dominos - I need to make a 12"x48" piece for the last one - and get one entire side of the layout benchwork in. I'm using the 1/4" Luan plywood from the backdrops on the legs to provide a uniform skirt that will cover up a lot of the clutter in the room underneath the layout. Much easier than actually taking care of the stuff is to just hide it in place! The plywood is blue (these were sky backdrops), but I will paint a dark color - perhaps a very dark Erie Green or even black.
Clutter soon to be hidden under the layout. Unfortunately, the "Eastbound Trains" sign (from the Erie's Goshen Station) points to the West.  Not sure where I am going to hang it so that it doesn't confuse operators.
I've got three more backdrop modules to convert and a couple of more 18"x48" modules, which need legs, and then I only need to build a few feet of new benchwork to complete the HBS portion. I'm not planning on laying track here immediately, though. I still want to do another pocket terminal next to start to prove out the idea of having scattered, lightweight and easily moveable yards serviced by car floats to begin with.
149th with new cars indicated by their car cards.
The 149th is sporting some new cars picked up from the annual train show, and it is close to being presentable to visiting operators. I would like to get another yard up before having an official session. I realized that with the regional convention slated to be in Austin in 2014, I should set a goal of having operating sessions for the convention. This means I need to pick up the pace. Deadlines do help move things along...








Huwebes, Abril 9, 2015

An HO Layout In Progress


This layout is by Tyler who works at our South store.
  • The Thompson River Snow Sheds in HO

    This is a project that has been sitting in the back of my mind for too long. I wanted to do some rugged mountain modeling with cliff faces that would be impressive to look at. I was too short on space to create a floor to ceiling mountain range but I knew some compromise could be found. I also knew there had to be grade built into my plan in order to avoid the mountains blocking my previous scenery. To do this I had to settle on a rather steep down grade to drop six inches below my current track level. A four percent is what it came out to be. Such a steep grade means helper service which just added to the appeal of this project.

    The snow sheds along the Thompson River are an iconic sight for the few remaining passenger trains that follow the route along the CN line. One of those trains is the Rocky Mountaineer which can just barely span the series of tunnels and sheds. They have taken a brilliant panoramic shot of their train spanning those sheds which I have been using to get my version as close to the real one as possible (see figure 1).


                         Figure 1- Basic foam mountain faces with Rocky Mountaineer panorama in the back ground. Panoramic photo source: Rocky Mountaineer [1].



    For me there was no time to waste in beginning this project, I did up a quick drawing of the proposed route and began construction (see figure 2). The benchwork was really just a simple shelf design, nothing pretty as the mountains will overhang and the skirting will cover the rest. I won’t go into any particulars about how I constructed the benchwork but rather I will lean towards the scenery techniques used through this series of blogs. 


                  Figure 2- Plan for the Thompson River route along current layout.


    With the benchwork complete, I went straight cutting some basic mountain faces from foam. The foam I used was salvaged from a roof repair, unfortunately for me this foam was fiberglass based and I was left with some irritated hands after avoiding the use of gloves. The foam itself did a great job though and being several inches thick it didn’t take long to build up the six inches of mountain face I was able to have. I tried to keep the foam carving rough to make the future plaster work as easy as possible. This is where a hot wire cutter (and some better foam) would come in very handy as it would keep the mess down and allow you to be even more creative with how you cut the foam. For the tunnels I drew an approximate track center line along the table top and used a tri-level auto-rack to make sure I had sufficient clearance through the tunnels. An NMRA gauge is also a good tool for this, however be careful as it won’t properly gauge the overhang around a tight curve. With the pieces of foam fully cut out (see figure 3), I secured them to the layout with a generous amount of hot glue (however I left the tops of the tunnel sections off until the track has been secured). There are certainly stronger glues you could use but I haven’t had any issues with hot glue, especially when the track work isn’t relying on the rigidity of the foam. If you are laying your track on a foam base I would strongly advise a glue which will cover the entire surface between the layout and the foam. It should also have enough flexibility to hold up to any flex and movement the layout may be put through.





            Figure 3- Basic foam design of the tunnels.



    Once the foam was finished, I began laying cork roadbed along the entire length of my Thompson river route. You could use foam roadbed which I’ve done it in the past, however I have grown to prefer the rigidity of cork and I feel it will keep the track level and aligned better than the foam will (with a 4% grade even the smallest of issues could be dangerous). To secure the road bed I used contact cement which provides a quick yet strong hold. I used Atlas code 83 cement tie flex track for the entire route. The concrete ties are prototypical to that portion of the CN line and has a very contemporary look which fits my modern layout well. To secure the track I used a very hot glue gun. It must be “very hot” to avoid any lumps if the glue has cooled before the track was properly laid. The hot glue is again quick which was important to me (being an engineering student, time is always at a premium). I soldered every rail joint to ensure good electrical connection, operational reliability, and realism because the prototype has welded rail meaning there should be minimal “click-clack.” 

    This project has been a lot of fun so far and I look forward to its completion along with every other step along the way. Hopefully I have inspired some of you to tackle that mountain railroading project you’ve been imagining. With some careful planning it doesn’t have to take up much space and in return it will cost you less in plaster. With the next blog I will begin the task of creating snow sheds and tunnel portals, as well as begin the plaster rock-work and show some other little details I have been adding. Lastly I would like to say that while I am modeling a prototype location and wish to be as accurate as possible, I don’t mind missing a few details along the way, it’s the big picture that I’m aiming for. So if I have misinterpreted any facts along the way I apologize and would be very interested in hearing about how it should really be from you guys. I will likely even change what I’ve done if it’ll help make this project as realistic as possible. 

    Disclaimer:
    [1] Rocky Mountaineer Rail Tours owns the panorama seen in the photo, this is not my own image. Rocky Mountaineer (Copyright 2011).

    This is Tyler's Layout. He works at our South store and is part of the FREE-MO group. Please feel free to come down to our South store to talk to him, Jesse, John or Rob; at our North store Ross, Leigh or Ken.

Linggo, Marso 8, 2015

149th St Progress


I spent an afternoon cutting out the plywood top for the Erie 149th St Yard project. I have several sheets of 3/4" Baltic Birch salvaged from some display cases, and I have found several projects in which to use pieces of the pile. My intent with this project is to build it so I can easily set it up, store it, and maybe take it to the local show. My idea was to make the plywood top the substantial portion of the benchwork and add some aluminum stiffeners below to connect to a base. I would split it up into pieces to be able to transport and store more easily.

[gallery link="file" orderby="ID"]

First thing I did was print out the track plan at full size in order to use it as a template. Even though it is a small layout, it still took several plotted sheets to create one large paper layout. Between the time I printed it out and actually started cutting plywood was probably 3 months. I then matched pieces of plywood to the plot and discovered I could use three sheets of plywood patched together from what I had on hand. I sketched out my cuts to avoid having turnouts on the joints, then transferred to the plywood. I made these joint lines such that they would interlock and help make a good connection.

After about 2 hours of cutting and fitting and maneuvering the heavy plywood I was able to see how everything would go together. I transported them inside and got a feel for how it would fit in the room. I was pretty excited, and felt a good sense of progress for the day.

I let the pieces sit for a few days, then stacked them off to the side while working on something else. I moved them again , then began to question my construction ideas. These pieces, although only a few square feet each, where really heavy. So heavy I have come to think, that I am reconsidering simply using them as templates for bench work that would be made from lighter materials. I spent a little time in the local big box lumber retailer looking at what was available in Luan or thinner Baltic Birch. The Birch wasn't Baltic - it was Whitewood with fewer ply and lighter density. I would use this for structure, so I wanted the dimensional stability of thinner plys and cabinet grade material. Whitewood wouldn't do it for me. The Luan looked pretty descent and came in 4x4 sheets, but only in 1/2" and not the 1/4" I was hoping for for a toping and sub roadbed. Stymied, I've gone back to laying track on my Z scale layout in the living room. I have finally felt an advantage of having multiple projects going on at the same time. I now have some breathing room to figure out what I want to do on the 149th and get satisfaction from accomplishing something I normally wouldn't have if I were only working on one layout at a time. I'll let you know if I find any other advantages to my multi-layout building strategy.

Lunes, Nobyembre 3, 2014

A video on some progress


Got a chance to get a video done on the little progress I have made over the last month.  Hope to get some scenery done on the new extension in the coming weeks.


Linggo, Marso 30, 2014

Progress since last weekend


I got a few things done on the layout last weekend and continued a little during this week.  Still working on Rappahannock Aggregate area with weeds and details.  I also starting adding signs and and other details to the road and road crossing to RA.

Here is the road to Rappahannock Aggregate.  Added a speed bump to hide a seam.  

Add some weed clumps to "vegitate" the area.  Got to find some more dump trucks.

Found a decent enough picture online to use as a backdrop.  Added some trees and bushes to make it look move believable.  The pic makes the backdrop pic stand out.    
 
These two ridges are for the spot in the background.  I will add trees to them.  Used the florist foam for the first time.  The Foam is definitely easier to paint.
On the lower level, I switched 2 industries around on the Mine Run Branch.  I switched the propane dealer and the woodchip loader.  It seems to me they fit better now.
This was the spot for the small propane dealer but the woodchip loader takes up less space in this spot.  I also did that homemade chip load with foam and sawdust.

This spot will hold two propane cars and is less tight for the larger propane tanks.  

Overview of the propane dealer.  The backdrop on the left is a print from online and the right is hand painted.  I need to add some more olive green to the paint!