Ipinapakita ang mga post na may etiketa na 149th. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na 149th. Ipakita ang lahat ng mga post

Biyernes, Hunyo 10, 2016

Reworking the 149th



I finished reworking the bench work on the 149th street yard several weeks ago, but I forgot to post results. I replaced the 15 ply Baltic birch with 2 layers of 3/4" foam, which reduced the weight considerably. I also added a new fascia board around the entire perimeter. I also built a make-shift storage cradle for it to make it easier to move around. I got a large spade bit to bore some weight reducing holes in the 1x frame members. I haven't reconnected the wiring.


I'm pleased with the results, but it is still too heavy and awkward to move by myself. I think I am going to start from scratch with a 2 or 3 section frame that can be separated and stored under the HBS when not in operation. The track plan is great fun to operate and worth this effort to get it right. I'm learning, too, and my mantra is "lighter is better."

I moved most of the HBS peninsula today (see last post) and countersunk some leg bolts I missed originally that were causing gaps in between modules.  I also cut shelf supports/ leg braces and started installing them. It stiffens up the legs well, and I'm looking forward to the storage space. 

There is still a lot of organizing to do, but there is progress on finally getting the room in a more comfortable shape. Went through 20 years of magazines including MR and saved 4 articles and a handful of issues for reference. The rest went into the recycling bin. I figure at this point that I will either get the DVD collection, or simply do an Internet search when I want ideas or how to articles on something. I freed up a whole lot of space, and I feel lighter. Lighter is better.

Lunes, Nobyembre 16, 2015

Erie 149th Street Harlem Station


 

A new layout to distract


So one thing you can do to avoid actually making progress on anything is to start a lot of different projects. As I am trying to figure out how construct the benchwork on my HBS layout so that it is easily disassembled to clear space in my office/guest room for other uses, I am contemplating starting on a small layout first to work out some of the issues I've identified that need attention.

Being a New York Harbor guy, I've done a lot of research on the various pocket yards around the harbor, and I've been inspired by work of David Ramos, Tim Warris and others. I also just want to get something up so I can run my trains.

I've used a free download of AnyRail software to draw up a plan of the 149th roughly as it appeared in the early 1950s. Total size is about 7'x5', and it would be a free-standing layout so there would be access all around it. I'm looking to use lightweight materials and split it into two sections for easy storage. It would feature a car float with tug, float bridge and several spots. The prototype had about one float unload and load a day, and I can imagine this would be a just right amount of operating time for a casual evening solo session. It would also be good for taking to shows and letting people try out operating.

I've made some changes since this image was created, most importantly increasing the size of the lead at the top of the plan by ooching the turnouts over to the right.

I've already got the boxcabs and S-1 that operated there for the Erie, and I have tested them out on the Peco code 75 Streamline track to much satisfaction so far. Perhaps I can get this up and running in short order to use as a test bed for establishing my construction standards for the HBS.

Great research site: Harlem 149th by Philip M. Goldstein

Other 149th Street layouts: Small Layout Scrapbook #96a (more photos) and #88, and another under way by Matthieu Lachance

Linggo, Marso 8, 2015

149th St Progress


I spent an afternoon cutting out the plywood top for the Erie 149th St Yard project. I have several sheets of 3/4" Baltic Birch salvaged from some display cases, and I have found several projects in which to use pieces of the pile. My intent with this project is to build it so I can easily set it up, store it, and maybe take it to the local show. My idea was to make the plywood top the substantial portion of the benchwork and add some aluminum stiffeners below to connect to a base. I would split it up into pieces to be able to transport and store more easily.

[gallery link="file" orderby="ID"]

First thing I did was print out the track plan at full size in order to use it as a template. Even though it is a small layout, it still took several plotted sheets to create one large paper layout. Between the time I printed it out and actually started cutting plywood was probably 3 months. I then matched pieces of plywood to the plot and discovered I could use three sheets of plywood patched together from what I had on hand. I sketched out my cuts to avoid having turnouts on the joints, then transferred to the plywood. I made these joint lines such that they would interlock and help make a good connection.

After about 2 hours of cutting and fitting and maneuvering the heavy plywood I was able to see how everything would go together. I transported them inside and got a feel for how it would fit in the room. I was pretty excited, and felt a good sense of progress for the day.

I let the pieces sit for a few days, then stacked them off to the side while working on something else. I moved them again , then began to question my construction ideas. These pieces, although only a few square feet each, where really heavy. So heavy I have come to think, that I am reconsidering simply using them as templates for bench work that would be made from lighter materials. I spent a little time in the local big box lumber retailer looking at what was available in Luan or thinner Baltic Birch. The Birch wasn't Baltic - it was Whitewood with fewer ply and lighter density. I would use this for structure, so I wanted the dimensional stability of thinner plys and cabinet grade material. Whitewood wouldn't do it for me. The Luan looked pretty descent and came in 4x4 sheets, but only in 1/2" and not the 1/4" I was hoping for for a toping and sub roadbed. Stymied, I've gone back to laying track on my Z scale layout in the living room. I have finally felt an advantage of having multiple projects going on at the same time. I now have some breathing room to figure out what I want to do on the 149th and get satisfaction from accomplishing something I normally wouldn't have if I were only working on one layout at a time. I'll let you know if I find any other advantages to my multi-layout building strategy.