Posted by Unknown on 5:00 PM in Foaming | No comments
Installed some foam tonight at water modules to clean up bulkhead line at Bethlehem Steel and float bridge.
Battery radio control system from CVP ordered. It will be an involved project to install in a switcher with an idler flat or gondola carrying the battery and maybe chip, too. Stay tuned.
0 (mga) komento:
Mag-post ng isang Komento