Worked most of the day on the Orange area and it is a lot more work than I realized. Working in a less than ideal space between levels is no fun. I've hit my hit several times. That probably explains the bad headache I had yesterday morning. Some of the jobs include stapling wires up, running track and road bed in hard to reach places, soldering in those hard to reach places and installing lighting. The good news is that I finally figured out the trackage in this area. Here are some pics of the progress:
Here we look down the roadbed from the hidden trackage
The view block installed. Got get this area painted before I more any farther.
The rest of the area:
Here my track plan:
0 (mga) komento:
Mag-post ng isang Komento