Well, finally finished up the upper level track change. The trackage is done, did all the wiring and complete the signals. This new track makes so much sense. No pics of that because wiring is necessary but boring. Tonight I wanted to cover a couple of tools that make my work on the layout so much easier.
The first one is my Klein Tools electrical nippers. I have had these forever and believe at one time they were my dad's back when I was building a crappy layout in the basement in my late teens. These do it all. Pull nails, strip wire, cut Kadee trip pins, cut wire, cut wood, pull staples are a few. I would be lost without them. The bent shape them makes perfect for pulling nails out of the road bed. The thing is, I have never sharpened them once in all these years.
The best tool I own. |
Wire and alligator clips soldered together. |
Here are the two signals down on the east end of the layout. They are a simple 3 light signal from Tomar. They have been hooked up to toggles and are ready to go.
The electrical boxes in front of the Carolina trailer are temporary. Been working hard in this area. |
Lastly, is a Tangent hopper that was painted into a Michigan Interstate hopper. The MCIS is the railroad of Greg McComas and I do some of his custom work. You can find the link to his blog on the right side of my blog. MCIS #7282 has shown up on the Midland with grain for Mid-Atlantic Feeds. |
0 (mga) komento:
Mag-post ng isang Komento