Miyerkules, Mayo 20, 2015

Lower level work has begun and so has the helix

Posted by Unknown on 5:00 PM in , , , , , , , , | No comments

Started packing my On30 items up yesterday and clearing them off of the lower level.  I had a On30 layout underneath Battlefield Yard and did an expansion past my work desk and under the VC yard.  Check out the older posts of the On30 layout:

http://virginiamidlandrr.blogspot.com/search/label/On30

The On30 track was all laid out and functioning.  It's nice because the track is the same as HO track and I can get a feel of what I have by running my HO trains down there.  I still have to take out the On30 track eventually.
VMID #281 giving me a feels of what lies ahead of the VM.  You can see BY directly above it. 

The other end.  There is a bridge crossing a canal between the 2 pictures.  The sand load spur will probably be where the hoppers are at the end.

Here's my helix in it's beginning stages.  Wanted to work in the garage but the near 0 degree temperatures made me stay inside.  the Helix kit is by Ashlin Designs out of Utah. 


0 (mga) komento:

Mag-post ng isang Komento