Ipinapakita ang mga post na may etiketa na continues. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na continues. Ipakita ang lahat ng mga post

Miyerkules, Setyembre 28, 2016

Confectionary facility work continues


Settled on the final name of the confectionary plant: Chespeake Valley Confectionary, Inc or CVC for short.  Here is the final layout and the walls all are secured together.  Now comes the tough part, the roof for the facility.  Lots of cutting and trial and error.  The color of the building will be close to the yellow already on it.  The mortar on the office turned out well.  Progress will continue this week.

The office end of the building.  The building will be on a base.

I extended the unloading shed a little so a hopper and a tank can both fill under the building.  I may extend it a little more.    

Overall view of the facility.  


Linggo, Nobyembre 22, 2015

Orange continues at a good pace


I've used this holiday weekend to get as much as I can done on the lower level at Orange.  It a weird setup, like a "L" shadow box, so I have to make sure I get everything done before I cannot reach certain areas.  This includes soldering feeder wires, painting the background blue and other small tasks.  The Norfolk Southern interchange can hold 4-5 cars and the VMID interchange can hold 3 cars.  These car lengths are 50' based.
Here is the entrance to Orange.  The spur to the left goes to the NS interchange and a untreated tie loading facility.  The trackless turnout will lead to the edge of the layout and a cassette for the VMID interchange.  The toggles on the right are for the signals at City Junction above.  

The interchange track is the closest and the tie place has the gondola on it's track. 

The track the gon is on is not glued down in case I need to move it.  

Here is the hidden trackage that leads to Orange.  Had to make sure that trackage was good to go before proceeding.  

The good thing about working on this lower level is that I've done it in a chair.  By the way, operating the lower level is strictly done in the chair! 

The interchanges will be an easy reach  for operators.  This view is right by the door.  

Did I mention my office is a total wreck!  This items in the middle of the room were under the area I'm working in.

Future expansion?  Might extend this area towards the me about 2-3 feet and take out the creek and bridge scene.  This would make the aggregate area a lot bigger.  But would require another crossing of the Midland.  Stay tuned.

Lunes, Hunyo 15, 2015

VMID Industry tour video series continues with part 2




Huwebes, Enero 8, 2015

Upper and lower level work continues


I've slowed down a bit on the work I've down this week.  Lots of tedious work the past couple of days like backdrop cutting and a shelf on the end of the extension.  I've completed all the track work on both levels and still need to add feeder wires to the track.
Attaching track.  I don't add subroadbed because this a branchline.

My end shelf.  Need to add another shelf and paint it black.


Trackwork complete.  I came back and super-elevated the closest curve.  I also added n-scale subroadbed to this curve which is not shown.

Another view of the trackage.

These sand hoppers test out the trackage.



The lower level trackage is done.  The CSXT boxcar sits on spur MOW spur.  To the left will be a older railroad building.

The gondola sit in the untreated tie loading spur.

The two spurs to the left are the VMID and NS interchange tracks.  The double ended train will bring 4 cars down and drop the lead engine where the boxcar is and then drop the cars in the interchange on the left..  Then pick their cars up and head back to Fredericksburg.

Had to cut into the the benchwork to get this unloading pit in.  Of course I forgot about it until I installed it!