Ipinapakita ang mga post na may etiketa na starts. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na starts. Ipakita ang lahat ng mga post

Martes, Nobyembre 4, 2014

Construction starts on West to Orange trackage project


Yesterday, I finally got started on my replacement of the Mine run branch or the area on the lower level below Battlefield Yard.  I ripped up the track and sub-roadbed to make way for my new trackage.  The new track plan will include a wye, a new entrance from the helix, continuous running on the lower level, a removable bridge and and new industries.  There also will be staging near the helix in the garage.  That's alot of stuff but only minor track changes.  Most of the track changes will be what I tore out yesterday.  Stay tuned!
The new trackage will come from the helix and out the wall behind the propane tanks in the pic.

Clean slate to start planning.

Here's the layout for the new trackage.  I have to contend with the canal which will be minimized by filling it in.  I will still need a bridge.  A siding will extend down to the cars in the distance.  The woodchip loader and possibly another industry will be located there.

This where the removable bridge will be located to span the isle.  The track shows appropriate placement.  This bridge will be the hardest part of the project.  


Biyernes, Oktubre 31, 2014

Work on the upper level starts


Just like my work desk, I have to have several projects going on at one time.  My layout is no different.  The lower level has come to a halt and I have moved to the upper level expansion.  I ripped out the bridge and river scene last night.  Amazing that it takes you days to do a scene and only minutes to rip it out.  This area represented some of my first scenery applications on this layout.  I did a decent job on it. I was mainly unhappy with it because of the track and ballast.  It did not look good and why did I ever use sectional track?  Most of the trackage on the VC in the old aggregate area is being removed.  The spur to the elevator will remain.  I will add another crossing to the VMID trackage to access the new expansion.  I will curve the VMID trackage toward the door and the removable cassette will no longer be needed.  It's alot more work but will look good when complete.
This scene is now gone.

Saving what scenery I can.  The VMID mainline between the signal and the electrical box will be curved now.

Popcorn and hard shell scenery made the hill side along with some plaster rock outcroppings.  

The river scene is no more.


Now time to rip out the track and ballast.

Thought I was done taking out track and ballast but since this is a difficult trackage with a crossing, I will have to rip out almost all of it.