Ipinapakita ang mga post na may etiketa na construction. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na construction. Ipakita ang lahat ng mga post

Martes, Marso 29, 2016

Helix platform construction Day One


I got started on the helix platform in the garage today.  It's a job in itself because the top of the platform is over 5 feet off the ground.  I had to build a decent frame for it.  They were not kidding when they say helix are a space hog.  This thing is about 7' by 6'.  A lot bigger than I wanted in the garage.  Guess it is too late to go back?  With the day off tomorrow, I hope to complete it.  I went to the Home Depot late last night for some lumber but had to return this afternoon for more lumber and screws.  I believe I might have to return again.  I'm using 2X3's for the frame and MDF 3/4" board for the top.  I will keep the middle open to observe/clean the helix.  Shelves will be under the helix size since I lost a ton of space in the garage.

The space I'll be working with.  The door leads to the layout now.

My office has some work done it too.  My work desk will be replaced with a smaller one.

Some beginnings of the framework.

Cameron helped me out a lot today.  Looks like I'm building a loft in the garage!

As far as I got tonight.  Should be able to finish tomorrow, I hope.


Biyernes, Hulyo 31, 2015

Construction Photos


It occurred to me that a blog about a model railroad would seem odd if there were no photos of said model railroad. So here are a couple photos of the progress that the track gang has made over the last few months. A six-track yard (plus passing track) was installed using Shinohara and Atlas switches and Peco track. The yard is code 70, with the passing track and main line code 83. The layout is oriented with the aisle running north-south, so it is divided into the ‘east half’ and ‘west half’ for the time being; someday we’ll get around to assigning proper names to the various tracks and locations. The yard is on the west half with curved north and south yard leads to maximize the track lengths. A spur will be run to the east side to serve about 3-4 industries.
The view from the train room door reveals a lot of mess during the yard construction. Fortunately most of it has been cleaned up. The diamond crossovers at right have since been replaced by a pair of Atlas turnouts to connect the main and passing track.

The north lead of the yard after correcting the finicky trackwork.
The south yard lead during construction, before ground throws installed. From rear, we have the main line, passing track, yard tracks 1-6 (closest switch will lead to engine shop), and main line again; it loops around to the right to connect with main line at rear.

View of the yard looking north from the south end during construction. 


See: most of the mess was cleaned up! Here I'm mocking up the east industrial spur. The rolling mill will go approximately where the blue box of switches is located in the photo. 


So far we have been successful in running trains on DCC on the layout with few derailments. Most have been attributed to cars with narrow wheelset gauge, or tight trucks leading to rail-climb derailments. The north yard ladder was found to have a couple trouble spots so a # 4 turnout from the passing track to the ladder was replaced with a longer-radius curved turnout. This helped smooth operations by eliminating the derailments caused by the sharp curve and the short transition from the level of the passing track to the yard. Next step will be to add some form of turnout control to the north end since it is not accessible for switching operations (unless access hatch is removed). At this point, both electrical and mechanical turnout controls are being studied but no decision has been made yet as to how we'll proceed. The south end of the yard has been outfitted with Caboose Industries ground throws since it is within reach and this is likely where the majority of the switching will take place.

Thanks for stopping by,
Cheers,
Peter.

Martes, Nobyembre 4, 2014

Construction starts on West to Orange trackage project


Yesterday, I finally got started on my replacement of the Mine run branch or the area on the lower level below Battlefield Yard.  I ripped up the track and sub-roadbed to make way for my new trackage.  The new track plan will include a wye, a new entrance from the helix, continuous running on the lower level, a removable bridge and and new industries.  There also will be staging near the helix in the garage.  That's alot of stuff but only minor track changes.  Most of the track changes will be what I tore out yesterday.  Stay tuned!
The new trackage will come from the helix and out the wall behind the propane tanks in the pic.

Clean slate to start planning.

Here's the layout for the new trackage.  I have to contend with the canal which will be minimized by filling it in.  I will still need a bridge.  A siding will extend down to the cars in the distance.  The woodchip loader and possibly another industry will be located there.

This where the removable bridge will be located to span the isle.  The track shows appropriate placement.  This bridge will be the hardest part of the project.