Not a whole lot happens on the Virginia Midland on the weekdays, but I've been trying to get better during the week to get a few things done if possible. Thirty minutes to an hour is what I try to squeeze in if possible, per day. Tonight, I continued to get the new trackage down to at least get trains running again. Trying to get the best possible plan is always fun. I have not changed much, but the tedious work continued.
 |
Nothing new here just upgrading roadbed and adding a longer Tortoise wire. |
 |
Had to move the desk out to get to what I was working on. It's nice to be sitting down to work! |
 |
This is my main work area right now. Many tools are a necessity for track laying. |
 |
The boxcars are on the continuous run track and a leg of the wye. The straight track towards the wall will lead to the helix. That track leading to the helix will also have a passing siding. |
 |
Overall view of the area I'm working on. The turnout on thr bottom of the pic goes to an industry spur. I had to move the bridge too. The background on the right will be replaced also. |
0 (mga) komento:
Mag-post ng isang Komento