Finally finished the scenery on the upper level. I redid the scenery in the corner the cat destroyed a few months back. I also completed the last "bare plywood" in the VC area. This area has been voided of scenery for a number of reasons. Main reason: it was a repair/maintenance spot. But it's done! Now you are wondering what got me into high gear. I had people coming by to look at the layout today. Nothing like a deadline to get you going!
 |
Land form for the replace corner near BY. The foundation is blue foam and the tan is 2" foam. |
 |
Basic scenery on the foam. It's nice to do this where you want then add it to the scene.
|
 |
Scenery mound in place
|
 |
Decided to add some rocks. These were made with plaster and molds. |
 |
Rocks have been hot glued in place now time for bushes, trees and the like. |
 |
The cabin and the truck have been put back in the scene. Most of the trees have been reused. |
 |
Close up of the cabin in the woods. Definitely a rail fans dream!
Thought I had completed the final track for this layout and I look like I'm headed down a redo of the lower level. Not a total redo but one that will make the layout flow. It includes a lift-out crossing and staging near the helix. A wye will be put in to have continuous running on the lower level. I will also redo the town names mainly switching them around. |
 |
Rough sketch of the new track plan for the lower level. |
0 (mga) komento:
Mag-post ng isang Komento