Ipinapakita ang mga post na may etiketa na start. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na start. Ipakita ang lahat ng mga post

Martes, Setyembre 1, 2015

Start Sets by Scalextric


There are a few Start Sets by Scalextric. The track is a little sturdier. Some of these sets:




What else makes them neat?

All you need to get started
This sets includes everything you need to get started, including skill level hand throttles – twist the dial on the side for the novice setting so that cars won't come off the track, or set it to advanced for more realistic skill-based racing. Also included are track, a lap counter, and two  racers.

Fun, flexible, and realistic
A lap counter is included in this set so that two drivers can set up to 50 laps of endurance racing. Each hand controller has a two-position selector switch which allows the driver to choose slow or fast speed settings to reflect the driver's experience.
The Scalextric Start track has a very easy push-together, pull-apart system which keeps assembly time down to a minimum. There are four alternative track shapes to make, and the vehicles are tough and robust. A sheet of decals is supplied with each car so that the car can be decorated with racing graphics.

Adjust the difficulty for different skill levels.

Why choose Scalextric Start?
The Scalextric Start range is designed to be the perfect introduction to Scalextric for children aged 5 years and up, featuring parts designed specifically for younger racers. The track pieces are especially easy to connect and disconnect, making for easier assembly and tidying away. Each set includes super tough cars built to take a tumble, and they need not whiz off the track at all thanks to the optional novice setting on the hand throttles. Scalextric Start is also compatible with standard Scalextric products.
Scalextric Start provides everything for the rookie racer in a ready-to-race package. Accelerate into the world of 1:32 scale slot racing; available in a selection of ready-to-race sets, Scalextric Start provides everything for the rookie racer!

With so many choices, you can really have an interesting layout and remember it can be expanded on with any number of accessories and of course, more track.



We hope you enjoyed this blog post.  Please comment and let us know what you think.  Feel free to share this article with a friend!

Thanks, from all the guys at Chinook & Hobby West

partial source



Martes, Hulyo 14, 2015

What to do where to start


So, I am inching ever-closer to the commit point where I actually start building on my layout. I'm in progress of making space, and the plan for clearing obstacles looks like it is going to work. I'm adding shelves and reconfiguring things for storage below the layout. Just need some time to finish it, and maybe an idea of what I am really going to do in order to motivate me to finish this stage of preparations. Other things that need to be considered are lighting and actual construction methods for the benchwork. But that will come later. What I need to decide is what/where I am going to start.

Where I am at the moment:

[caption id="attachment_170" align="alignnone" width="601" caption="Version 2.0 includes the Hoboken Shore Railroad, and the Weehawken and Croxton Yards of the Erie Railroad with a small version of the Dial-A-Yard concept. This lays out the industries in order on the HBS."]Version 2.0 includes the HBS, Weehawken and Croxton Yards of the Erie Railroad and small version of the Dial-A-Yard concept.[/caption]

Option 1: Start on the big layout (room-encompassing) of the Hoboken Shore Railroad (HBS) with Erie Croxton Yard as seen in the version 2.0 plan above.


This would be a large project. The most disruption, the most money, the most effort... Major sub project would be figuring out how to deal with my "real work" area, which consists of computer, drafting table, table space and file and flat file cabinets. The tables/desks and layout above them would need to be configured somehow so that it is comfortable to do both at the appropriate time. I've been thinking in this direction for about 4 years, so there is really good background, momentum and interest for me. In research, I am getting into finding building plans and photographs of a lot of the industries along these lines. I could really closely model all the major buildings. In fact, I just started modeling the Dept. of Agriculture Quarantine Building in 3DS Max (just for practice using the software). The next thing to do for this option is to lay out the track in the yards especially, to make sure I can actually do what I am hoping to do. In the architecture biz, we call this moving into a DD set - Design Development. This is where the concepts come into contact with practical considerations and I have to make things 'work'.

Option 2: A larger Dial-A-Yard with New York Harbor pocket yards that would be about 5' x 7'. Possibly including Erie 28th St, Erie 149th, DL&W Harlem Terminal, and one or two others...then build the HBS later in a slightly smaller version.


I'm really interested in the Dial-A-Yard concept. I have 9 foot ceilings, so I could get 4 or 5 yards stacked in one 5' x 7' area. The engineering of a mechanized lift system would be a challenge (fun), but it would delay the start (and playing with) any sort of layout. An alternative is to build this just outside the room in the hall. That would be a tough sell to the brass hat, but is worth looking into the feasibility both space-wise and R.O.W. wise.

Option 3: A room full of yards connected by car float carts.


OK, I just thought about this for the first time thanks to David Ramos' post on the Rail Marine Yahoo! Group. It made me take another look at his layout plan, and the multiple yards/multiple railroads started me off thinking how amazing it would be to have a dozen yards from around NY Harbor all in one room. Four or 5 car float carts and one staging area to feed them. A pure, cohesive concept for a layout that would be innovative and interesting to operate (as long as one likes small yard switching). The downside is that it would be all one type of operating. Version 2.0 has the advantage that it includes a large a large yard, smaller yard, and branch line industrial switching. That fact could sway me. I will need to poll my potential operating crew for reaction to this idea. It may be that all those yards would be boring? It is worth drawing it up. As you can tell by the lengthy discussion of this option, I am intrigued by this idea.

I let you know what happens next.