Ipinapakita ang mga post na may etiketa na Foaming. Ipakita ang lahat ng mga post
Ipinapakita ang mga post na may etiketa na Foaming. Ipakita ang lahat ng mga post

Biyernes, Setyembre 16, 2016

Foaming


Installed some foam tonight at water modules to clean up bulkhead line at Bethlehem Steel and float bridge.

Battery radio control system from CVP ordered. It will be an involved project to install in a switcher with an idler flat or gondola carrying the battery and maybe chip, too. Stay tuned.